Productivity and Efficiency Calculation | Concepts of Production and Productivity in Garment Industry | Productivity Calculation in Apparel Industry
In apparel manufacturing sector, apparel productivity can be calculated by using the below formula:
Apparel production floor |
A production line of Trina Fashion wear limited produces 250 dozens shelf camies by 30 operators in 10 hours. Standard time of shelf camies is 250 seconds. Calculate productivity for that production line.
Total working time= 10,
=1080000
=750000
= 69.44%
So, line productivity of Trina Fashion wear limited is 69.44 per hour.
SL No. | Item | Standard time | Quantity | No. of operator |
01 | T-Shirt | 250sec | 1800dz | 30 |
02 | Dress Shirt | 1000sec | 7200pcs | 45 |
03 | Shelf Cammy | 250sec | 1800dz | 30 |
3. Output-hour in second for Shelf Cammy= 1800×12×250=5400000sec.
So, total Output-hour in second= (5400000+7200000+5400000) = 18000000sec.
Input-hour calculation in second= {(30+45+30) ×60×3600} = 22680000sec.
= 79.36%
So, garment productivity for that factory stands at 79.36%
She completes 12pcs per day. Calculate here true productivity and overall productivity.
Working hour in a day= 10hours,
Input-hour in minute= ((Number of operator × total working time×60) = (1×10×60) = 600min.
Overall productivity= {(Output-hour/Input-hour) ×100} = {(384/600) ×100} = 64%