Out-put Hours Calculation of Sewing Line Formula | Output Hours of Sewing Line Calculation
What is Output-Hour in Apparel or Clothing Industry?
In the apparel manufacturing sector, output-hour is the volume of apparel production in pieces multiplied by standard time and then divided by 3600, where standard time is expressed in seconds.
![Output hours calculation method of sewing line](https://i0.wp.com/textiletutorials.com/wp-content/uploads/2017/06/Output-hours-calculation-method-of-sewing-line.png?resize=650%2C400&ssl=1)
Method of Output Hours Calculation of Sewing Line in Apparel Sector:
Output-hour of sewing line,
= {(Number of garments × standard time in seconds)/3600}
The above formula will be clear if you follow the below examples.
Example-01:
In Farzana fashion limited, a production line produced a 1200 pcs dress shirt in 10 hours. The standard time of the dress shirt is 1000 seconds. Calculate output-hour of sewing line in that factory.
Solution:
Here,
Number of garments= 1200pcs,
Standard time= 1000 seconds.
So,
Output-hour of sewing line,
= {(Number of garments × standard time in seconds)/3600}
= {(1200×1000)/3600}
= 333.33
So, output-hours of sewing line for Farzana fashion limited is 333.33
Example-02:
A production line of Faria fashion wears limited produced 200 dozen T-shirts in 10 hours. The standard time for the T-shirt is 200 seconds. Estimate output-hour of the sewing line.
Solution:
No. of apparel= 200 dozen= (200 ×12) = 2400pcs,
Standard time= 200 seconds
So,
Output-hour of sewing line,
= {(Number of garments × standard time in seconds)/3600}
= {(2400×200)/3600}
= 133.33
So, output-hours of sewing line for Faria fashion wear limited is 133.33
Example-03:
In Tithi fashion point, a production line produced 100 jackets in 10 hours. The standard time of the jackets is 600 seconds. Calculate the output-hour of that sewing line.
Solution:
No. of garments= 100,
Standard time= 6000 seconds
So,
Output-hour of sewing line,
= {(No. of garments × standard time in seconds)/3600}
= {(100×6000)/3600}
= 166.66
So, output-hours of sewing line for Tithi fashion point is 166.66
Example-04:
In Mustakim fashion view, a production line which produced 500 jackets in 10 hours. The standard time of the jackets is 600 seconds. Calculate the output-hour of that sewing line.
Solution:
No. of garments= 500,
Standard time= 6000 seconds
So,
Output-hour of sewing line,
= {(No. of garments × standard time in seconds)/3600}
= {(500×6000)/3600}
= 833.33
So, output-hours of sewing line for Mustakim fashion view is 833.33